We were in "hog heaven" on this interior painting project. This project was completed in 2002, requiring 15 highly skilled professionals and 112 working days. This job included interior painting of walls and pipes. The pipes were painted with zinc primers and finished with a silvertone base paint product that can withstand temperatures up to 1400 degrees. The walls were painted with a 2 part epoxy and multi fine lines as a decor. The floors were prepped with a high pressure wash and acid etched and finished with oil base paints and a high gloss sealer. The opportunity to work with the worlds greatest motorcycle manufacturer was quite a thrill.